The handover report is your document
It comes from your system, on your letterhead, and your people can adjust it. For a court, that is "the rental company's version".
VIDIMUS/CASE FILES/EQUIPMENT & MACHINE RENTAL
Every rental company knows it: the machine leaves in good order, comes back damaged, and the hirer denies it. Your handover report is a PDF from your own system; their word stands against yours. This page shows how to record handover and return so that there is nothing left to deny.
Aerial work platform, handover on Monday morning: in good order, hour meter 1,412, six photos. Return on Friday: boom dented, hydraulic hose damaged. Hirer: "That dent was already there at handover — your photos are of a different machine." Repair: €18,400. Your proof: a PDF that you can make and adjust yourself.
It comes from your system, on your letterhead, and your people can adjust it. For a court, that is "the rental company's version".
A scribble on a tablet during a rushed handover convinces few people — certainly if the hirer says they never saw the photos.
Often the machine is dropped off when nobody from your side is there. Then your findings are one-sided — and therefore weak.
Without a handover report drawn up in the presence of both parties, the hirer is presumed to have received the goods in the condition in which they return them. The burden of proving that the damage was caused by the hirer lies with you. Your general terms and conditions can regulate this — if the condition at handover is on record.
Between businesses, evidence may be given by any means: sensor data, photos and digital reports are admissible. Their weight depends on how independent they are of the party relying on them.
General information, not legal advice. Vidimus provides evidence; how much weight it carries is for the court to assess — and that weight is exactly what anchoring increases.
Ten disputed damage cases a year × 4 hours × €75, plus an average of €2,400 in repair costs not recovered ≈ €3,000 in hours and €24,000 in damage that you bear yourself — per depot. One anchored handover report costs a fraction of that.
Yes. Each sensor becomes a measurement source, with a unit and a range: each measurement gets a fingerprint and is anchored in batches. That way, the time of the shock is on record too.
Then your team member signs, and the hirer receives the report and the verification link by email. Not disputing it within the period in your general terms and conditions then counts against them.
Yes. The dashboard puts two records with the same reference side by side: which fields changed, and the photos per part (front, hour meter, accessories) — with the caption typed in at the moment itself. Each side remains a separate record with its own fingerprint, signature and timestamp; the comparison changes nothing.
No. Your software remains the source; we connect via API or webhook, or you use the signing module separately alongside it.
You create your account in two minutes. No payment details needed. A director identifies your company once with the Belgian eID; then you create your first logbook in a few minutes. The first 100 records a month and the first measurement source are free. After that, you pay per record or per measurement source, with a minimum of €19 a month.